|
Characterizing a Multi-Channel Controller for Gas Detection and Monitoring
Protecting people, equipment and plants operating in hazardous environment industries, such as oil/gas, chemical, pulp/paper, electric utilities, water/waste treatment, ... Sponsored By:
General Monitors
|
Brazil’s state-run Petroleo Brazileiro has launched the 38-in, 179-km Cabiúnas-Reduc III (Gasduc III) gas pipeline, which is capable of carrying 40 million cu m/day.
Negotiations have begun to link Corsica to the 940-km Galsi pipeline planned between Algeria and Italy, French President Nicolas Sarkozy said on a visit to Corsica, a French island off the Mediterranean coast (OGJ, June 8, 2009, Newsletter).
C & C Technologies has completed a second project using the PROSAS Surveyor SAS sonar to assess pipeline integrity in the Gulf of Mexico.
Acergy has awarded CRC-Evans/Global Pipelines a contract to provide onshore double jointing of production lines as well as offshore welding services for the EnCana Deep Panuke natural gas field.
Indonesia’s BP PLC-led Tangguh liquefied natural gas facility is running at 70-80% of capacity on its two trains that are designed to produce at least 7.6 million tonnes/year of LNG.