Print this article    Email this article    Save this article  
| RSS FeedAdd RSS Feed


Technip wins Gjøa field fabrication, installation contracts


Offshore

Offshore Staff

STAVANGER -- StatoilHydro has awarded Technip Norge a $97-million contract for the fabrication and installation of structures and tie-in of the pipeline systems for the Gjøa project.

The contract includes:
• Fabrication and installation of tie-in structures for the in-field pipelines and export pipelines
• Fabrication and installation of expansion loops and guards
• Tie-in of risers, in-field pipelines, and export pipelines towards tie-in structures and templates
• Water filling, cleaning, dimension control, and pressure testing of pipelines.

The fabrication work will start during the autumn of 2008. Installation work will continue through the 2009 season.

06/17/2008

Page 1 of 1




PennEnergy Blogs

PennEnergy Perspectives
Don’t miss this insightful—and sometimes controversial—weekly blog about the petroleum and power scenes today, written by seasoned reporter and editor, Bob Williams.
ImpactWeather Tropics Watch
Catch the latest hurricane updates and insights from ImpactWeather meteorologist, Chris Hebert.