Print this article    Email this article    Save this article  
| RSS FeedAdd RSS Feed


TDW completes Independence Trail flex-join isolation operation


Offshore

Offshore staff

HOUSTON -- TDW Offshore Services has successfully completed a key subsea flex-joint isolation operation on the Independence Trail natural gas pipeline for Enterprise Products Partners in the Gulf of Mexico.

The isolation operation allowed critical repairs to be made on the flex-joint assembly of the 20-in. (51-cm) export riser on the Enterprise Independence Hub platform in Mississippi Canyon block 920 that had begun to leak in April 2008.

08/27/2008

Page 1 of 1




PennEnergy Blogs

PennEnergy Perspectives
Don’t miss this insightful—and sometimes controversial—weekly blog about the petroleum and power scenes today, written by seasoned reporter and editor, Bob Williams.
ImpactWeather Tropics Watch
Catch the latest hurricane updates and insights from ImpactWeather meteorologist, Chris Hebert.