PennWell Petroleum Group
PUBLICATIONS EVENTS RESOURCE CENTER BOOKSTORE FINANCIAL PRODUCTS CLASSIFIEDS EQUIPMENT JOBS SUBSCRIBE MEDIA KIT
SUBSCRIBE magazines | e-newsletters
| advanced           Hurricane Watch
site map | about 








Events
October 2008

October 7

Kingwood, TX USA
Phone:: 918 493 3872
Fax:: 918 493 3875
Email
Website

October 7-10
Almaty, KAZ
Phone:: + (44) 020 7596 5000
Fax:: + (44) 020 7596 5111
Email
Website

October 8-9
Lisbon, PRT
Phone:: 713 292 1945
Fax:: 713 292 1946
Email
Website

October 8-10
Paris, FRA
Phone:: +31 50 521 30 78
Fax:: +31 50 521 19 46
Email
Website

October 13-15
Berlin, GER
Phone:: +44 1737 365100
Fax:: +44 1737 365101
Email
Website

October 13-17
Long Beach, CA USA
Phone:: 202 682 8000
Fax:: 202 682 8222
Website

October 13-15
Abu Dhabi, UAE
Phone:: +44 207 067 1800
Fax:: +44 207 430 0552
Email
Website

October 14-16
Houston, TX USA
Phone:: 919 549 8411
Fax:: 919 549 8288
Website

October 14-16
Moscow, RUS
Phone:: +44 (0) 207 067 1800
Fax:: +44 (0) 207 430 0552
Email
Website

October 14-16
Warsaw, POL
Phone:: +44 207 067 1800
Fax:: +44 207 430 0552
Email
Website

October 14
Northbrook, IL US
Phone:: 888-503-5536
Email
Website



| RSS Feed Add RSS Feed


New York

Oil & Gas Journal

By OGJ editors
HOUSTON, Sept. 8 -- Talisman Energy Inc., Calgary, said its Fortuna Energy Inc. unit completed two exploratory gas wells in the Ordovician Black River formation in the Finger Lakes region.

Fortuna Ganung Hz on a nonproducing structure in Schuyler County tested at rates up to 2.4 MMcfd despite unspecified operational problems. It is to be hooked to a gathering system.

Fortuna Konstantinedes HZ in Chemung County flowed as much as 10.4 MMcfd and was shut-in for pressure buildup. It is to be tied to a Columbia high-pressure transmission line by yearend 2003.

Fortuna's first two operated wells on its recently acquired New York properties, the wells "have healthy economics at rates below half a million cubic feet per day," said Talisman president and CEO Dr. Jim Buckee.

Fortuna was drilling Hepfner, its third well. Two more rigs are to begin drilling in September and October. The company's 2003 budget for the area is $46 million.

Page 1 of 1




| RSS Feed Add RSS Feed