PennWell Petroleum Group
PUBLICATIONS EVENTS RESOURCE CENTER BOOKSTORE FINANCIAL PRODUCTS CLASSIFIEDS EQUIPMENT JOBS SUBSCRIBE MEDIA KIT
SUBSCRIBE magazines | e-newsletters
| advanced           Hurricane Watch
site map | about 







Events
September 2008

September 8-11

Bergen, NOR
Phone:: 972 952 9393
Fax:: 972 952 9435
Email
Website

September 9-10
Amsterdam, NET
Phone:: 713 292 1945
Fax:: 713 292 1946
Email
Website

September 10
Denver, CO USA
Phone:: 918 493 3872
Fax:: 918 493 3875
Email
Website

September 15-17
Los Angeles, CA USA
Phone:: 202 682 8000
Fax:: 202 682 8222
Website

September 15-18
Rio de Janeiro, BRA
Phone:: 55 21 2112 9078
Fax:: 55 21 2220 1596
Email
Website

September 16-19
GEO India Event
New Delhi, IND
Phone:: +973 17 550033
Fax:: +973 17 553288
Email
Website

September 16
Los Angeles, CA USA
Phone:: 202 682 8000
Fax:: 202 682 8222
Website

September 17-19
New Delhi, IND
Phone:: +44 (0)20 7840 2100
Fax:: +44 (0)20 7840 2111
Email
Website

September 21-24
Denver, CO USA
Phone:: 972 952 9393
Fax:: 972 952 9435
Email
Website

September 23
Aberdeen United Kingdom
Phone:: + 44 (0) 20 7467 7106
Fax:: + 44 (0) 20 7580 2230
Email
Website

September 29-October 1
Cannes, FRA
Phone:: +44 1737 365100
Fax:: +44 1737 365101
Email
Website



| RSS Feed Add RSS Feed


GRTgaz plans pipeline expansions for gas imports

Oil & Gas Journal

Doris Leblond
OGJ Correspondent

PARIS, July 3 -- Gaz de France's transport subsidiary GRTgaz plans to enlarge and upgrade its French pipeline system capacities to accommodate additional natural gas imports from five planned LNG terminals and four proposed entry pipelines from other European countries.

Uncertainties exist in planning, however: it is unknown, for example, how many of these current projects will actually come on stream, what competition there may be from other operators' future transport networks, and the growth of combined-cycle gas power units, all of which involve prospective new clients needing new transport capacities.

Following a prospective study, GRTgaz strategy head Philippe Garnier reckons that overall, some €5 billion would be needed to further develop, upgrade, and complete the network through 2017.

Half of the €5 billion will be devoted to making the network more flexible, but additional projects will depend on the number of entry points actually built at the borders with Germany, Belgium, Spain, and Switzerland as well as on the five proposed LNG terminal projects—Dunkirk, Antifer (Le Havre), Montoir extension, Le Verdon, and Shell's Fos Faster. If all projects are built, entry capacity would increase by 80%.

Emphasis is put on developing the link between GRTgaz's North and South zones because the demand of suppliers already is exceeding the available pipeline capacity offered. To decongest the N-S network, some 800 km of gas pipelines would be required at a cost of €1.6 billion. GRTgaz has examined different solutions at lower costs but remains uncertain whether or not to merge the two zones.

What is certain is that by Jan. 1, 2009, the existing network and the market will have been simplified, reduced from five zones (four GRTgaz and one Total Infrastructure Gaz France) to three: North and South for GRTgaz and one TIGF. With the multiplication of new entry points—at the borders and at LNG terminals—gas sources will be in competition. A gas exchange is due to be set up by the end of this year.

GRTGaz said the probability is that only 60% of the projects will actually come to fruition, involving investments of some €2.5 billion. Developments for entry and exit capacities at the different borders for which feasibility studies have been conducted will increase gas capacities during 2008-11 by 200 Gw-hr/day in the North zone and by 500 Gw-hr/day in the South zone.

Such investments, cautions GRTgaz, will require tariff increases of about 22% over 2008-17—a 2.8% increase/year.

Investments not linked to creating a flexible and fully accessible network can be estimated at about €2.4 billion. These involve €500 million for environmental regulation compliance, €300 million to link the network to combined-cycle units and gas developments on large industrial sites such as refineries, €460 million for public service obligations, and about €1.1 billion towards security of its network and replacing obsolete equipment.

Page 1 of 1




| RSS Feed Add RSS Feed