PennWell Petroleum Group
PUBLICATIONS EVENTS RESOURCE CENTER BOOKSTORE FINANCIAL PRODUCTS CLASSIFIEDS EQUIPMENT JOBS SUBSCRIBE MEDIA KIT
SUBSCRIBE magazines | e-newsletters
| advanced           Hurricane Watch
site map | about 








Events
November 2008

November 24-25

Muscat, OMN
Phone:: 713 292 1945
Fax:: 713 292 1946
Email
Website

November 25-26
Cernobbio, Lake Como, ITA
Phone:: +44 (0) 1737 855281
Fax:: +44 (0) 1737 855482
Email
Website

November 27
Offshore Energy 2008
Rijkswerf Willemsoord, Den Helder, The Netherlands The Netherlands
Phone:: 010 43 60 112
Fax:: 010 43 68 134
Email
Website

December 2-5
Suntec, SING
Phone:: +44 (0)20 7840 2100
Fax:: +44 (0)20 7840 2111
Email
Website

December 2-4
Prague, CZE
Phone:: +44 207 067 1800
Fax:: +44 207 430 0552
Email
Website

December 3-5
Perth Australia
Website

December 3-4
Galveston, TX USA
Phone:: 713 292 1945
Fax:: 713 292 1946
Email
Website

December 3-5
Kuala Lumpur, MAL
Phone:: +971 (0)4 390 3540
Fax:: +971 (0)4 366 4648
Email
Website

December 3-4
Singapore, SING
Phone:: +44 (0) 207 067 1800
Fax:: +44 (0) 207 430 0552
Email
Website

December 3-5
New Orleans, La. US
Phone:: 216 464 2785
Fax:: 216 464 2768
Website

December 8-9
New York, NY USA
Phone:: 212 686 6808
Fax:: 212 686 6628
Email
Website



| RSS Feed Add RSS Feed


GE Energy to Supply Latest Gas Injection Technology for Caspian Sea Project

Oil, Gas & Petrochem Equipment

Agip KCO, an Eni affiliate acting as operator of the North Caspian Sea Production Sharing Agreement, has awarded GE Energy a contract to supply an ultra high-pressure, sour gas injection system for the Kashagan oil field in the North Caspian Sea. Located off the coast of Kazakhstan, Kashagan is one of the largest fields discovered over the last 30 years.

The North Caspian Sea joint venture participants include the following contracting companies: Agip Caspian Sea B.V. (Eni), BG International Ltd., ExxonMobil Kazakhstan Inc., Shell Kazakhstan Development B.V., Total E and P Kazakhstan, ConocoPhillips and Inpex North Caspian Sea Ltd.

The project will utilize GE Energy's latest technology for gas injection applications. Associated sour gas will be injected back into the oil reservoir at pressures up to 760 bar, the highest discharge pressure ever developed for gas injection.

The scope of GE Energy's contract covers the initial gas injection system including the supply and full-load testing of two turbo compressor lines, engineering, procurement and technical field supervision.

The two turbo compressor lines, each designed to inject 5.4 million scm/day of sour gas, will be manufactured at GE Energy's facilities in Florence, Italy. The three-stage/three-case gas compressors are being specifically developed by GE for this project.

Driving the compressor lines will be GE Frame 5D, heavy duty gas turbines. These are 30-megawatt class machines that provide the high reliability and availability required for high-pressure applications. Maintenance will to be done directly at the site. The Frame 5D gas turbines will be equipped with Dry Low NOx systems for emissions control.

The contract marks the start of the execution phase of GE Energy's work on the Kashagan project, which began in 2001 with GE's development of the basic engineering of the associated gas injection system.  Delivery of the gas injection system to the project site is expected during the second half of 2006.

www.gepower.com