|
|
| Save Article Instructions | Close |
| TransAsia plans refinery relocation project | |
|
|
|
|
By an OGJ correspondent The company is seeking formal approval from the Environmental Protection Agency and the Sindh government to implement the project on a fast-track basis, reported the EPA. TransAsia awarded a contract on Apr. 21 to Descon Engineering of Lahore for the engineering, construction, products and utilities pipelines design and construction, crude and export products storage-handling facilities design and construction, and utilities and off-sites construction. The project is scheduled for completion by April 2010. Page 1 of 1 |
|
| To access this article, go to: http://www.pennenergy.com:80/pennenergy/en-us/index/articledisplay.content.global.en-us.articles.oil-gas-journal.processing.transasia-plans-refinery-relocation-project.1.html |
|
| Copyright © 2008: PennWell Corporation, Tulsa, OK; All Rights Reserved. |