Hearing set in Ashley on Merricourt Wind Power Project

By The Associated Press

The North Dakota Public Service Commission has rescheduled a public hearing in Ashley regarding the Merricourt Wind Power Project in Dickey and McIntosh Counties.

 

BISMARCK, N.D. (AP) — The North Dakota Public Service Commission has rescheduled a public hearing in Ashley regarding the Merricourt Wind Power Project in Dickey and McIntosh Counties.

The hearing on a proposal to amend the project's permit initially was scheduled for June 28 but had to be postponed.

It's now been rescheduled for Wednesday, Sept. 13. It's to begin at 10:30 a.m. Central time in Ashley City Hall.

EDF Renewable Development Inc. wants to revise its site plan for the proposed 75-turbine, 150-megawatt wind farm, following coordination with the U.S Fish and Wildlife Service to reduce the risk for whooping cranes and piping plovers.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs