Navajo Nation entity starts solar farm amid station closing

By The Associated Press

A Navajo Nation entity has taken its first step to generating electricity by starting a solar farm.

 

KAYENTA, Ariz. (AP) — A Navajo Nation entity has taken its first step to generating electricity by starting a solar farm.

The Daily Times of Farmington, New Mexico, reports (https://goo.gl/kLBfCz) the Navajo Tribal Utility Authority recently started operating the 27.3-megawatt Kayenta Solar Project on 200 acres (.8 square kilometers) near Kayenta, Arizona.

Officials say it is the first large-scale solar energy facility on the reservation.

Solar farm project manager Glenn Steiger says the closing of the Navajo Generating Station is leaving a hole in power generation in the region. He says that hole ultimately will be filled with renewable energy.

Steiger says the solar panels are equipped to position flat when wind speeds increase more than 50 mph. He says two weather stations on site monitor wind speed, temperature and humidity.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs