Eni restarts activities at Val d'Agri Oil Centre

Source: Eni

Eni has restarted operations from Viggiano's Val d'Agri Oil Center - the resumption of the plant's operational activities follows approval from the relevant authorities confirming the functionality of the plant and the presence of all necessary safety conditions.

Eni has restarted operations from Viggiano's Val d'Agri Oil Center (COVA) following approval from the Regional Council of the Basilicata Region. The resumption of the plant's operational activities follows approval from the relevant authorities confirming the functionality of the plant and the presence of all necessary safety conditions. 

The various operational procedures for rebooting and restarting the system, during which limited and controlled flaring events may occur, will be carried out ensuring maximum protection of workers' health and respect for the environment. In doing so, both Eni's own monitoring systems and Arpab’s own control units will constantly monitor air quality parameters.

Eni's Viggiano's Val d'Agri Oil Center was closed in April 2017.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs