Company agrees to dismantle reactor at Vermont nuclear plant

By The Associated Press

A company that specializes in dismantling nuclear reactors has signed on to help tear down an idled Vermont power plant.

 

VERNON, Vt. (AP) — A company that specializes in dismantling nuclear reactors has signed on to help tear down an idled Vermont power plant.

AREVA Nuclear Materials has agreed to handle the disassembly of the Vermont Yankee reactor and its internal components and transport the materials to a secure disposal location in Texas.

The Washington, D.C.-based company signed a deal with NorthStar Group Services, which plans to buy the plant and handle its decommission.

Vermont Public Radio reports (http://bit.ly/2sQodMF ) AREVA says it will use specially designed remote-control tools to disassemble and package the reactor and its internal components, which are submerged in a shielding pool.

NorthStar promises to demolish the reactor and restore the site by 2030, decades sooner than the plant's current owners had planned.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs