Solar panels renewable energy project dedicated at Fort Hood

By The Associated Press

Military officials say the Army's first hybrid renewable energy project that includes both off and on-post power generation has been dedicated in Texas.

 

FORT HOOD, Texas (AP) — Military officials say the Army's first hybrid renewable energy project that includes both off and on-post power generation has been dedicated in Texas.

Ground was broken in early 2016 at Fort Hood for the Department of Defense-related project. Dedication ceremonies were held Friday at the Central Texas post.

A Fort Hood statement says the hybrid renewable energy project, featuring the Phantom Solar Farm, produces 65 megawatts of alternating current.

The Fort Hood site includes about 63,000 solar panels that provide 15 megawatts of power. A wind farm in Floyd County has 21 turbines providing 50 megawatts to support the Fort Hood project.

Backers have said the program is expected to produce enough electricity to provide up to 40 percent of Fort Hood's needs.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Shell Leverages Data to Transform from Reactive to Predictive Operations

This 6-page report describes how Shell engaged in a massive project with OSIsoft to transform the...

Selection, Use, Care and Maintenance of FR Clothing

For industries operating in an inherently dangerous environment, the importance of selecting the ...

Evolution or Revolution: IT / OT convergence means a world of possibilities

The oil and gas industry is experiencing a rapid paradigm shift in regards to digital transformat...

Predict, Prescribe, Profit: Creating a World that Doesn't Break Down

What are you doing to reduce unplanned downtime at your plant? Equipment breakdowns and process i...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs