New group wants SC to stop passing on nuclear plant costs

By The Associated Press

A group of small businesses, environmental groups and community leaders are joining together for the first time to ask South Carolina regulators to reject part of a rate increase to pay for nuclear power plants under construction.

 

COLUMBIA, S.C. (AP) — A group of small businesses, environmental groups and community leaders are joining together for the first time to ask South Carolina regulators to reject part of a rate increase to pay for nuclear power plants under construction.

The group called Stop The Blank Check said Monday it wants the Public Service Commission to refuse South Carolina Electric & Gas's request to pass on $846 million in increased costs.

The Legislature gave SCE&G permission in 2007 to raise rates to pay for the plants before they open. The new group says that law has given SCE&G a blank check.

The new nuclear power plants in Jenkinsville are set to open in 2019 and 2020 will cost an estimated $14 billion, $4 billion more than first thought. They are years behind schedule.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs