Continental Resources announces record STACK oil well

Source: Continental Resources Inc.

Continental Resources, Inc. announced the completion of an industry record well in the over-pressured oil window of Oklahoma's STACK play.

Continental Resources, Inc. announced the completion of an industry record well in the over-pressured oil window of Oklahoma's STACK play. The Verona 1-23-14XH flowed at an initial 24-hour test rate of 3,339 barrels of oil equivalent per day, comprised of 2,345 barrels of oil, or 70% of production, and 6.0 million cubic feet of 1,370-Btu natural gas (British thermal units). The Verona is producing from the Meramec reservoir through a 9,700-foot lateral at a flowing casing pressure of approximately 2,400 psi, on a 34/64-inch choke.

"The Verona is another example of the exceptional results we are getting from wells drilled in the over-pressured oil window of STACK," said Harold Hamm, Chairman and Chief Executive Officer. "We couldn't be more pleased with the performance of our wells in STACK and the addition of this outstanding asset to our portfolio. Our STACK team also completed the Verona at a cost of approximately $9.0 million, which is $500,000 less than our year-end 2016 target cost for two-mile lateral wells in the over-pressured oil window. This is the Company's lowest cost completion in STACK to date." 

The Verona is the Company's ninth well completed in the over-pressured oil window of STACK, and all have been strong producers. The Company is in the process of completing four additional Meramec wells. Continental currently has 11 operated rigs drilling in STACK, with six targeting the Meramec zone and five targeting the Woodford zone.

Located in Blaine County, Oklahoma, the Verona is immediately east of the Company's Ludwig unit, where Continental is currently drilling an eight-well density pilot, its first in the STACK play.  The density pilot consists of seven new wells in the Upper and Middle Meramec reservoirs, as well as an additional well in the Woodford reservoir underlying the Meramec.  Results from the Ludwig density pilot are expected to be announced by the Company's third quarter 2016 earnings release.

As announced earlier in the month, at March 31, 2016 Continental had approximately 171,000 net acres of leasehold in the STACK play, 95% of which is in the over-pressured window.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Latest Energy Jobs

View more Job Listings >>

Archived Articles

PennEnergy Articles
2008 | 2009 | 2010 | 2011 | 2012 | 2013

OGJ Articles
2011 | 2012 | 2013

OGFJ Articles
2011 | 2012 | 2013

Power Engineering Articles
2011 | 2012 | 2013

Power Engineering Intl Articles
2011 | 2012 | 2013

Utility Products Articles
2011 | 2012 | 2013

HydroWorld Articles
2011 | 2012 | 2013

COSPP Articles
2011 | 2012 | 2013

ELP Articles
2011 | 2012 | 2013