Construction start on Johan Sverdrup platform

Source: Statoil

The platform will be completed in the first quarter of 2019, before it is installed on the Johan Sverdrup field by use of the world’s largest heavy-lift vessel, the Pioneering Spirit.

Apprentice Jens Erik Eriksen in Kværner and Norway’s minister of petroleum and energy Tord Lien marked the construction start on the Johan Sverdrup utility and living quarters platform on the island of Stord, north of Stavanger, Thursday, March 31.

Statoil awarded a joint venture between Kværner and KBR the contract for engineering and construction of the topside for the utility and living quarters platform for the Johan Sverdrup field in June 2015.

 

Stord is central in a comprehensive Johan Sverdrup project. Kværner Stord will fabricate parts of the topside steel frame, and will also assemble all parts for the utility and living quarters platform before the platform is installed on the field in 2019. At peak around 2000 Kværner employees will be involved in Johan Sverdrup deliveries.

Kværner’s sub-supplier Apply Leirvik on Stord will construct the accommodation module for the living quarters platform, which will be the biggest on the Norwegian continental shelf (NCS).

The other modules for the utility and living quarters platform will be constructed at the Energomontaz Polnoc Gdynia (EPG), Mostostal Pomorze Gdansk (MPG), Mostostal Chojnice and Crist Offshore in Poland, as well as in Gothenburg, Sweden. Detailed engineering is performed at KBR’s office in Leatherhead, London, and at Apply Leirvik on Stord. The fabrication work was also kicked off today at two of the yards in Poland and at Apply Leirvik’s yard.

The utility and living quarters platform will accommodate the crew working on the Johan Sverdrup field during the field life of 50 years. The platform will have the largest living quarters on the NCS with a capacity of 560 people. The platform will also accommodate the field’s control and emergency centre, and some utility systems covering the whole field centre.

The platform will be completed in the first quarter of 2019, before it is installed on the Johan Sverdrup field by use of the world’s largest heavy-lift vessel, the Pioneering Spirit.

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs