Developer renews push to build Allegany wind farm

The Associated Press

A wind power developer is renewing its effort to build a 17-turbine project in Allegany County over the objection of the local zoning board.

CUMBERLAND, Md. (AP) — A wind power developer is renewing its effort to build a 17-turbine project in Allegany County over the objection of the local zoning board.

The Cumberland Times-News reported Monday that Dans Mountain Windforce LLC has asked the state Public Service Commission for a Certificate of Public Convenience and Necessity for the project near Cumberland. The project was previously exempted from certification under state rules aimed at accelerating wind power development.

The developer says the certificate would pre-empt local land-use restrictions on wind farms.

The firm also is seeking a waiver of a two-year notice requirement so it can start construction this fall.

The Public Service Commission has scheduled a pre-hearing conference on the matter March 3 in Baltimore.

The wind farm would be the first in Allegany County.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs