Massachusetts nuclear power plant to close by 2019

Associated Press

The owners of the Pilgrim Nuclear Power Station in Plymouth have announced that they will close the plant by June 2019.

BOSTON (AP) — The owners of the Pilgrim Nuclear Power Station in Plymouth have announced that they will close the plant by June 2019.

Entergy Corp. said Tuesday it is closing the only nuclear power plant in Massachusetts because of "poor market conditions, reduced revenues and increased operational costs."

The decision comes about a month after federal inspectors said they would increase oversight of the plant in the wake of a shutdown during a winter storm. The plant needs millions of dollars in safety improvements.

The plant was relicensed in 2012 for 20 years.

The timing of the shutdown depends on several factors, including further discussion with ISO-New England, the operators of the regions's power grid.

Entergy Chairman and Chief Executive Officer Leo Denault said the decision to close Pilgrim was "incredibly difficult."

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs