Nuclear Power, Energy, Power, Entergy Vermont Yankee nuclear plant begins gradual power down - PennEnergy

Vermont Yankee nuclear plant begins gradual power down

VERNON, Vt. (AP) — The Vermont Yankee nuclear power plant has begun a gradual reduction of the electricity that it generates that will end with the plant shutting down in December.

The so-called coast-down period typically occurs at the end of the plant's operating cycle as the nuclear fuel in the reactor is depleted.

The state's only nuclear power plant has been generating electricity continually since the spring of 2013, a stretch of 500 days.

Entergy Nuclear (NYSE: ETR), Vermont Yankee's owner, made the decision last year to close the plant at the end of the current fueling cycle, December of this year.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs