NCS announces completion of wells employing first-time fracturing system

Source:NCS Energy Services

The fracturing system accomplishes 60 frac stages in one well, with 40 stages placed in a single 24-hour period, resulting in more precise, predictable stimulation. NCS Energy Services announces the successful completion of two horizontal Cardium wells, employing a first-time combination of high-rate slickwater and the NCS Multistage Unlimited fracturing system. The company placed more than 60 frac stages in one well, with aggressive spacing of individual fracture stages.

“We continue to be pleased with the success we are seeing as we push the envelope of multistage completions,” said Eric Schmelzl, vice president of Strategic Business for NCS Energy Services. “This successful combination of the Multistage Unlimited system with high-rate slickwater opens new avenues for bringing precision and predictability to unconventional completions.”

Treating rates of 49 bbl/min (7.8m3/min) enabled placement of 40 frac stages in a single 24-hour period, making tightly spaced fractures a viable and economical alternative to less precise and unpredictable stimulation methods. Cemented NCS GripShift casing sleeves provided fast and reliable formation access, and subsequent analysis of downhole gauge data identified any hydraulic communication between frac stages.

Calfrac Well Services provided the field execution of the new marriage of slickwater technology with high-density pinpoint fracture placement, believed to be an industry first in the evolution of multistage completion technology.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs