Cidade de Itajai prepares for Santos Basin production

Source:Petrobras
Cidade de Itajai

Petrobras announces that the FPSO Cidade de Itajaí arrived at its final location on the morning of December 29 to be integrated to the Baúna and Piracaba field production system in the post-salt Santos basin. The vessel which was chartered from OOG-TKP (the consortium formed by Odebrecht Óleo and Gás & Teekay Petrojarl) is being prepared for anchor and should start production this month.

The FPSO unit, which produces, processes, and stores oil, is capable of processing up to 80,000 barrels of light oil and of compressing 2 million cubic meters of natural gas per day. The platform will be interconnected to six production and five injector wells, of which four used for water and one for gas.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs