Oil & gas processing: IBS introduces innovative blind rack inventory management system

Source: Industrial Blind Solutions

Industrial Blind Solutions (IBS), is the leading manufacturer of industrial blinds for the petroleum and chemical processing industries. The company has designed an innovated racking system that provides customers with the right blinds when they need them, improving efficiency and time on tools during the turnaround process. IBS presorts all blinds and delivers them already organized on the rack, increasing ease of access while reducing sorting time at the project’s start.

Every IBS blind rack is manufactured to meet the individual customer requirements. The blinds inventory is always on display and easily identifiable by the workforce. IBS blinds are available in sizes up to 96 inches at the flange to meet most the customer’s specific requirements.

The lockable IBS blind racking system allows customers to protect their inventory on the racks, eliminating loss of blinds between projects, while having them ready for the next project. The combination of the IBS inventory racks and the blinds colored “T” handles successfully reduces the loss of blinds on the job site to roughly 5%.

The innovative IBS racks are designed for easy deployment, as they can be moved by forklift or crane.

The IBS blinds rack rental/purchase program allows customers to save time and money with the right blinds at the right price.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Overcoming ICS Management Challenges

Customers confirm they save 80% of their time identifying, analyzing, and reporting ICS cybersecu...

Securing Industrial Control Systems: The Basics

Since isolation seems to be impossible for control system environments, how do companies protect ...

Case Study: Create a Sustainable NERC CIP Compliance Program

With over 100 endpoints, a large US generation and transmission utility was spending 2-3 hours co...

Latest Energy Jobs

View more Job Listings >>

Archived Articles

PennEnergy Articles
2008 | 2009 | 2010 | 2011 | 2012 | 2013

OGJ Articles
2011 | 2012 | 2013

OGFJ Articles
2011 | 2012 | 2013

Power Engineering Articles
2011 | 2012 | 2013

Power Engineering Intl Articles
2011 | 2012 | 2013

Utility Products Articles
2011 | 2012 | 2013

HydroWorld Articles
2011 | 2012 | 2013

COSPP Articles
2011 | 2012 | 2013

ELP Articles
2011 | 2012 | 2013