AREVA to deliver fuel assemblies to Gosgen nuclear power plant

Source:AREVA

AREVA has been awarded a contract for the fabrication of fuel assemblies for five reloads for the Gösgen nuclear power plant. In the frame of this supply contract, AREVA will deliver 180 fuel assemblies to the Swiss utility, Gösgen- Däniken AG (KKG), starting in 2018.

AREVA constructed the Gösgen nuclear power plant and has been fabricating its fuel elements since its startup in 1979. The group is currently retrofitting the reactor’s instrumentation and control technology using AREVA's digital safety I&C TELEPERM® XS system.

“This contract reinforces the solid relationship developed between the Gösgen- Däniken AG and AREVA. By successfully providing both reactor and fuel related services to this client, it confirms the competitiveness of the group’s integrated offer and strengthens our position as nuclear supplier in Switzerland,” explained Guillaume Dureau Senior Executive Vice President of AREVA’s Front End Business Group.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs