Offshore rig design agreement awarded by BP

Source: BP
BP

BP announced today it has reached an agreement with Maersk Drilling to develop conceptual engineering designs for a new breed of advanced technology offshore drilling rigs that will unlock the next frontier of deepwater oil and gas resources.

The agreement is part of BP’s Project 20KTM, a multi-year initiative to develop next-generation systems and tools for deepwater exploration and production that are beyond the reach of today’s technology.

BP and Maersk Drilling will collaborate on concepts for deepwater drilling rigs that can operate in high-pressure and high-temperature reservoirs up to 20,000 pounds per square inch and 350 degrees Fahrenheit.

A jointly staffed engineering team will be located in Houston, with back-office support from Maersk Drilling’s headquarters in Copenhagen, Denmark. The team will perform the engineering studies required to select the optimal design of the 20KTM drilling rigs, riser and blowout prevention equipment. BP will then determine how best to proceed with construction.

It is anticipated some of the technologies to be developed and deployed on the new rigs will include advanced operating systems to aid the situational awareness of the rig crew and inform decision making; real-time blow-out-preventer monitoring to continuously verify functionality of the BOP; and significantly enhanced mechanical capabilities of the BOP, rig structures and piping systems.

“This agreement marks another important step in taking Project 20KTM from concept to reality,” said Neil Shaw, BP’s Chief Operating Officer, Projects. “It also highlights BP’s commitment to seeking out the best partners and minds for a project that will move the entire offshore industry forward.”

BP announced the launch of Project 20KTM in February 2012, setting out its intention to develop technologies over the next decade in four key areas: well design and completions; drilling rigs, riser and blowout prevention equipment; subsea production systems; and well intervention and containment.

BP estimates it could potentially access an additional 10-20 billion barrels of resources across its global portfolio over the next two decades with the application of Project 20KTM technology. These resources are inaccessible with current equipment, which has a technical limit of 15,000 psi pressure and temperatures of 250 degrees Fahrenheit.

In the Gulf of Mexico, BP expects Project 20KTM technology will play an important role in developing major deepwater discoveries it has made in recent years, including Kaskida and Tiber. Those discoveries are found in an emerging play known as the Paleogene, where BP holds a strong lease position. BP also sees potential applications for the technology in Egypt, Azerbaijan and other deepwater basins around the world.

In November, BP announced the first two contract awards for the project. KBR will develop program execution and management plans for Project 20K™, including capital cost and schedule estimates, risk assessments and technical designs. FMC Technologies will participate in a technology development agreement, in which it will work jointly with BP to design and develop 20,000 psi rated subsea production equipment, including a subsea production tree and a subsea High Integrity Pressure Protection System.

Whitepapers

Pervasive Governance: Rethinking Traditional Approaches to Information Governance for Oil & Gas

Information is an organization’s most important strategic asset – the “lifeblood” of the organiza...

OSHA 1910.269 Are You Regulation Ready?

Read this Q&A to learn about changes to federal regulations and how to select FR garments for...

AVEVA’s Digital Asset Approach - Defining a new era of collaboration in capital projects and asset operations

There is constant, intensive change in the capital projects and asset life cycle management. New ...

On the Radar: EMC Supplier Exchange

This report addresses key issues for managers of complex contracts in energy and engineering. Thi...

Webcasts

Adding GPS vehicle management to your team

A GPS fleet management system can be a highly effective tool to help lower costs, improve productivity, and manage your vehicles more efficiently. But with many vendors and prod...
( 08/25/2015 / 12:00 PM Eastern Daylight Time / 11:00 AM Central Daylight Time / 09:00 AM Pacific Daylight Time / 16:00 GMT )
Sponsored by

Transforming the petroleum supply chain with the Internet of Things

The equipment involved in producing, moving, refining and selling petroleum is expensive, and rugged, and comes from hundreds of manufacturers. Enhanced by the Internet of Thing...
Sponsored by

Connected Decision-Making: Improving Asset Operations Through Comprehensive Information Management

Energy asset operators are faced with a paradigm today: increase efficiency and reliability levels while fighting to extend the lifespan of these aging asset. To meet these oppo...
Sponsored by

Latest Energy Jobs

View more Job Listings >>