Statoil awards wireline tractor service contracts

Source: Statoil

Welltec and Aker Well Services will deliver solutions for equipment deployment and maintenance in horizontal wells on more than 40 installations on the Norwegian continental shelf.

This technology is important to increase recovery on Statoil’s fields offshore.

Statoil has, together with its partners, awarded Welltec and Aker Well Service AS wireline tractor services contracts for Statoil-operated fields on the Norwegian continental shelf (NCS).

Wireline tractor services are used to transport well intervention equipment - such as logging tools, perforating guns and plugs - up to several kilometres in horizontal wells.

Wireline tractor services are also used to perform remedial work to assure and increase production from the wells.

"Wireline tractor services represent a vital and cost effective tool for maintenance in our horizontal wells. Maintenance and repair of wells is one of the most important measures we have to increase recovery," says Øystein Arvid Håland, head of drilling and well in Statoil.

Welltec's contract amounts to 40% of the scope and includes the installations operated from Bergen: Gullfaks, Huldra, Kvitebjørn, Visund, Veslefrikk, Valemon, Oseberg, Brage, Troll, Grane, Heimdal, Gullfaks SAT, Oseberg SAT, Vega, Tune, Fram, Vestflanken (Troll), Vale, Vilje, and Bygve/Skirne.

Aker Well Service's contract amounts to 30% of the scope and includes the installations operated from Stavanger, Stjørdal and Harstad: Statfjord, Volve, Sleipner, Snorre, Gudrun, Dagny (including Ermintrude) Morvin, Åsgard, Trestakk, Kristin, Heidrun/ SAT, Norne / SAT, Njord, Tyrihans, Mikkel, Yttergryta, Alve, Urd, Aasta Hansteen, Snøhvit,and Hyme.

Mobile drilling, completion and intervention units on the NCS operated from the Stavanger office will be an optional scope where all prequalified suppliers are evaluated and chosen on a job-by-job basis. This amounts to the remaining 30% of the scope.

The contract period is four years and will run from 1 February 2013 until 31 January 2017. Statoil has secured two times two-year options on each contract. The values of the awarded contracts without options are:

- Welltec - NOK 540 million.
- Aker Well Service - NOK 400 million.

Statoil's present wireline tractor operations are handled by Welltec and Aker Well Service AS under contracts until 31 January 2013.


Sign up for PennEnergy's eNewsletters
For Email Newsletters you can trust

Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon Sign up for our Email Newsletter
For Email Marketing you can trust

Weekly Newscast

 

Whitepapers

Substation Communications Design Legacy to IEC 61850 Best Practices

Two trends, the migration of the electrical grid to the “Smart Grid” and the adoption of Ethernet...

How to Mitigate Risk and Ensure Compliance: Govern Your Documents Accordingly

Too often, organizations hear “information governance” and think “records management” and “compli...

Using Information Intelligence for the Energy Sector

  In this IDC Energy Insights white paper, sponsored by EMC, the author provides an overview...

Enterprise Content Management in the Energy Industry: Increase Safety and Reliability, Reduce Costs and Damages

This Frost & Sullivan white paper looks at the need for enterprise content management to incr...

Latest Energy Jobs

View more Job Listings >>

Technical Digest

 

Archived Articles

PennEnergy Articles
2008 | 2009 | 2010 | 2011 | 2012 | 2013

OGJ Articles
2011 | 2012 | 2013

OGFJ Articles
2011 | 2012 | 2013

Power Engineering Articles
2011 | 2012 | 2013

Power Engineering Intl Articles
2011 | 2012 | 2013

Utility Products Articles
2011 | 2012 | 2013

HydroWorld Articles
2011 | 2012 | 2013

COSPP Articles
2011 | 2012 | 2013

ELP Articles
2011 | 2012 | 2013