Aurelian begins flow test at second shale gas well in Poland

Source: Aurelian Oil & Gas

Aurelian Oil & Gas (AIM:AUL) has commenced a stabilized flow test on the second Siekierki tight gas Multi-Fracced Horizontal Well (MFHW) Trzek-3

The planned six fracs have been completed without material mechanical issues. Well clean up operations and a Memory Production Log have all been completed. 

A stabilized flow test, expected to last between 14 and 28 days, has now commenced at the second Siekierki MFHW, Trzek-3. 

Trzek-3 is targeting a separate high to other wells in the Siekierki structure with a recoverable resource estimated at between 16 and 28 billion cubic feet. 

The Siekierki project is located on the Poznan licences which are 100% held by Energia Zachόd Sp. z.o.o., a company owned 90% by Aurelian and 10% by Avobone N.V.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs