Aurelian begins flow test at second shale gas well in Poland

Source: Aurelian Oil & Gas

Aurelian Oil & Gas (AIM:AUL) has commenced a stabilized flow test on the second Siekierki tight gas Multi-Fracced Horizontal Well (MFHW) Trzek-3

The planned six fracs have been completed without material mechanical issues. Well clean up operations and a Memory Production Log have all been completed. 

A stabilized flow test, expected to last between 14 and 28 days, has now commenced at the second Siekierki MFHW, Trzek-3. 

Trzek-3 is targeting a separate high to other wells in the Siekierki structure with a recoverable resource estimated at between 16 and 28 billion cubic feet. 

The Siekierki project is located on the Poznan licences which are 100% held by Energia Zachόd Sp. z.o.o., a company owned 90% by Aurelian and 10% by Avobone N.V.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs