KGRA Energy breaks ground on waste heat recovery project in North Carolina

Source: KGRA Energy LP

KGRA Energy LP, a premier US-based waste heat recovery developer, announced that civil engineering has begun and equipment delivery continues on an innovative clean energy system being installed at a Greenville, NC area mill owned by Weyerhaeuser Company (NYSE:WY), one of the world's largest forest products companies. The project, developed by KGRA Energy, in partnership with Turbine Air Systems Inc., will capture waste heat from the mill and covert the captured thermal energy into clean electricity

The project will create approximately 20 construction jobs in Ayden, NC, where the mill is located. Roberts Company, a Winterville, North Carolina-based constructor is constructing the balance of plant for the project. When completed, the project will provide Weyerhaeuser's mill approximately 4.5 million kilowatt hours of 100 percent emission free electricity per year and displace the equivalent of more than 9 million pounds of carbon dioxide each year. 

KGRA Energy's system employs an organic Rankine cycle based power generation skid packaged by Turbine Air Systems at their Houston, TX factory. This skid, scheduled to arrive the first week of August will convert the mill's waste heat to useable energy. At the Weyerhaeuser lumber mill, heat will be recovered from a kiln where cut lumber enters the drying process. 

Organic Rankine cycle technology recovers waste heat from viable sources, such as combustion engine exhausts, furnaces, boilers, and kilns, and converts it into usable CO2-free electricity, which lowers energy costs as well as heat pollution. Organic Rankine cycle has been tested and deployed since the 1960s. It is the primary power generation tool used in the low-temperature heat recovery industry and has been deployed at more than 1,500 sites throughout the US and around the world. 

KGRA's systems are modular and scalable, providing the ability to produce power from smaller and lower-temperature heat sources previously deemed unsuitable for standard cogeneration. KGRA projects are customized for the direct needs and specifications of each customer.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs