KUB-Gas hits gas with M-19 exploration well in the Ukraine

Source: Kulczyk Oil

Kulczyk Oil Ventures Inc. achieved successful gas test at the KUB-Gas M-19 well in Ukraine. KOV acquired 70% of KUB-Gas in June 2010. 

The M-19 well commenced drilling on August 16, 2010, only two months after the closing of the partial acquisition of KUB-Gas by Kulczyk Oil. The well reached a total depth of 2,060 metres in mid-October, encountering several potential new gas-bearing reservoirs. 

The M-19 exploration well, located approximately 2 kilometres from the Makeevskoye field, was designed to evaluate 3 separate targets: (1) a Triassic target at a depth of approximately 700 metres; (2) a seismic anomaly at an approximate depth of 1,450 metres; and (3) the potential of a deeper reservoir series. 

The well was logged with locally available logging tools as well as western logging tools so that the Company can compare the results between the two sets of logging data over the same formations and gain a better understanding of the old logs. The M-19 well is the first well within the 4 fields operated by KUB-Gas in Ukraine to be logged with modern logging tools. 

The logs indicated that, while the Triassic target was not present, the seismic anomaly was an approximately 18 metre thick sandstone unit that appeared to contain hydrocarbons. It was this sandstone unit that was produced at 5 MMscf/d of natural gas through a 10 mm choke when tested in December. In addition, several zones which appear to contain hydrocarbons were identified within the underlying Muscovian target section.
The successful testing of the newly discovered zone in the M-19 well has confirmed the effectiveness of modern seismic interpretation techniques in the identification of new exploration targets.

KUB-Gas has initiated the processes to obtain the necessary regulatory approvals for construction of a pipeline and tie-in of the M-19 well. Regular production from the M-19 well is expected to commence during the second quarter of 2011 with a production target of approximately 2 MMscf/d for the remainder of the year. 

Exploration and development plans for 2011 include a continuous drilling program focused on the Makeevskoye and Olgovskoye license areas and the acquisition of 3D seismic in those areas commencing late in the first quarter.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs