Ithaca achieves 100% production increase through workover ops at Beatrice Alpha in the UK North Sea

Source: Ithaca Energy

Ithaca Energy Inc. (LON:IAE) (TSX:IAE) has achieved stable production from the first workover well on Beatrice Alpha, increasing production by 100% to 680 barrels of oil per day, in line with expectation.

The Beatrice Alpha well A04 is part of a five well work over program. Operations on the A04 well involved the replacement of a downhole pump.

Activities have commenced to workover the second well of the five well campaign (Beatrice Alpha well A23). The A23 well was producing approx. 260 bopd gross before being shut in early October to commence workover operations. A further production update will be provided after the well has been brought back on line and flow rates have stabilized.

Joint Venture Partners in the Beatrice Field are Ithaca (50%) and Dyas UK Ltd (50%). Beatrice Alpha is located in the UK North Sea.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs