TNK-BP exceeds production levels at OJSC Varyoganneftegaz through drilling, hydraulic fracturing

Source: TNK-BP

Well intervention works are being successfully performed in the fields of OJSC Varyeganneftegaz incorporated in TNK-BP. The main emphasis in the activities of this enterprise is on drilling, current and capital workover of wells, and hydraulic fracturing. 

A total of 30 hydraulic fracturing jobs are planned for May, six jobs more than scheduled. Seven wells have been put into operation so far, producing 76 tons of oil a day. Another 4 wells are going to be commissioned with the expected daily production of 59 tons of oil. 

Owing to successful well interventions, Varyeganneftegaz is going to produce in May over 7,000 tons of oil more than scheduled in the business plan.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs