Mustang to tackle Belinda FEED

Offshore staff

HOUSTON -- Noble Energy has contracted Mustang to perform front-end engineering design (FEED) for the Belinda project in Block `O’ offshore Equatorial Guinea.
The scope includes the design of the jacket and topsides for the offshore facility, in 243 ft (74 m) of water, which will process gas condensate. Belinda is being designed as a gas cycling project to extract the field’s condensate and re-inject the gas for future sales.

05/03/2010



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs