ConocoPhillips extends production life of Eldfisk facilities, pipelines

Source: Petroleum Safety Authority Norway

ConocoPhillips (COP) Skandinavia AS has received consent to continue using 2/7-A, 2/7-B, 2/7-FTP and pipelines on the Eldfisk field beyond their original planned lifetime.

Eldfisk 2/7A and 2/7FTP (Field Terminal Platform) have a bridge connection and are part of the Eldfisk complex, together with the Eldfisk 2/7E water injection facility (installed in 1999). 

Eldfisk 2/7B lies on the northern part of the Eldfisk field. Oil and gas are transported through two pipelines to the Ekofisk complex. 

The consent is valid until December 31, 2015.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs