Statkraft commissions Peruvian hydropower plant

Statkraft has opened the Cheves hydropower plant in Peru, the ninth such project in the country for the Norwegian state-owned power company.

The new hydroelectric power plant is located 130 kilometres north of the capital Lima, on the Huaura river and consists of two aggregates with a total installed capacity of 172 MW and exploits a gross head of 600 meters. The power plant is the first greenfield project developed and constructed by Statkraft alone in South-America.
Statkraft logo 

Chevez will have an annual generation of around 840 GWh based on water from the Andes. The electricity generated will be sold on a long-term Power Purchase Agreement (PPA) with 8 local distribution companies.

"The opening of Cheves consolidates Statkraft's position among the largest power producers in Peru. It also underlines our ambition to further strengthen our position as a leading international provider of pure energy. Our efforts in South-America play a very important role in this strategy," says EVP International

 



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...