Guatemala may raise renewables tender to 400 MW

Guatemala's Ministry of Energy and Mines and the National Electric Energy Commission are examining the feasibility of increasing the capacity of the tender for renewables-based projects PEG 3 from 250 MW to 400 MW.

The tender was announced last September.

An increase in the capacity is being considered because of delays in the construction of a number of thermoelectric (coal-based) projects that will produce 300 MW once completed.

Minister of Energy and Mines Erick Archila said he expects the renewable energy tender to be held between April and June this year, reports Energias Renovables.

The renewables projects will be awarded 15-year contracts, for a start-date of operations in 2017.

For more Renewables news.

For more Latin America news.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...