Japanese firm wins Saudi combined cycle plant contract

Japanese engineering firm Yokogawa Electric Corporation has announced that its subsidiary, Yogokawa Middle East, has received an order to supply systems and operator training simulators for the Kingdom of Saudi Arabia’s Shoaiba II combined cycle power plant, which is being built for Saudi Electricity Company (SEC).

The Arab News reports that the Shoaiba II combined cycle power plant, located south of Jeddah, will have 10 gas turbines and two steam turbines with a combined output of 1200 MW (two blocks of 600 MW each) and is scheduled to start operations in June 2013.
Shoaiba ccp
The order is for a comprehensive solution comprising a Centum VP control system and a simulator which will be used to train operators under complex simulated plant operating conditions.

The Centum VP control system at the plant will be for the integrated control of heat recovery steam generators (HRSG) and gas turbines.

For more Middle East power generation news



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...