LaSalle Nuclear Unit 2 Taken Offline for Obstruction

file

By Editors of Power Engineering

Exelon announced it had taken LaSalle Nuclear’s Unit 2 offline this week to inspect an obstructed valve on the unit’s turbine generator.

All systems responded as designed. Technicians will address the blockage and thoroughly test the system before returning the unit to service. Unit 1 remains at full power.

LaSalle, 75 miles southwest of Chicago, has a capacity of 2,300 MW and was built in 1984. It was recently granted license extensions through 2043.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...