PSEG Solar Source Acquires 36.3-MW Colorado Solar Project

 PSEG Solar Source Acquires 36.3-MW Colorado Solar Project

PSEG Solar Source has acquired a 36.3-MW solar photovoltaic (PV) facility from juwi Inc.

PSEG Larimer Solar Energy Center is being built on 290 acres about 25 miles north of Fort Collins, Colorado.  The project, featuring approximately 117,000 polycrystalline PV panels, represents an investment of more than $54 million by PSEG.

juwi Inc. will continue to serve as the engineering, procurement and construction contractor.

Construction is scheduled for completion by the end of 2016.

A 25-year power purchase agreement is in place with Platte River Power Authority.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...