Capstone Receives 4.6-MW Order from Horizon Power Systems

 Capstone Receives 4.6-MW Order from Horizon Power Systems

Capstone Turbine Corporation has received a 4.6-MW order from Horizon Power Systems for a large flare gas energy project in North America.

The order includes three C800 systems and two C1000 systems.

“The global slowdown in the energy industry is shifting customers away from exploration to an increased focus on lowering operating costs at existing assets and converting on-site flare gas to power generation.  This is one way Capstone microturbines can be used to lower oil and gas users’ monthly operational costs,” said Darren Jamison, president and CEO of Capstone Turbine Corporation.  “We have recently added additional oil and gas sales resources at Capstone, and we are encouraging our key distribution partners, like Horizon, to do the same.”

Horizon Power Systems is the exclusive Capstone Turbine distributor for Texas, Oklahoma, Kansas, Arizona, the Rocky Mountain States, Intermountain Regions, Gulf Coast States and the Western Provinces of Canada.  This order brings the company’s total fleet to more than 600 operational microturbines.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...