Contractor Prepping Land for DTE Energy Ohio Wind Farm

 Contractor Prepping Land for DTE Energy Ohio Wind Farm

Workers are preparing land in Ohio’s Chandler, Oliver and Colfax townships for a new wind farm.

DTE Energy contractor Aristeo Construction is currently surveying the land, collecting and analyzing soil samples and establishing an area for storing equipment, materials and office trailers.

DTE Energy plans to install 30 of GE’s 1.7-MW wind turbines, which stand 315 feet in the air and feature about 160-foot blades.

Construction is expected to begin in the spring of 2016, though site plans are not finalized. The turbines are proposed for near DTE Energy's Echo Wind Park in Chandler and Oliver townships.

The project is a redo of one slated for Meade Township in 2015 but residents ultimately voted against it.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...