GEH supplies 500th nuclear control rod blade

 GEH supplies 500th nuclear control rod blade

GE Hitachi Nuclear Energy (GEH) delivered its 500th Ultra Control Rod Blade to the Pilgrim nuclear power plant in Massachusetts as part of a multi-blade order.
 
GEH has delivered Ultra blades to boiling water reactors globally, including in the U.S., Finland, Germany, Spain, Sweden, Switzerland and Taiwan. The first Ultra Medium duty blades were delivered in 2009, and the first high duty blades were supplied in 2011. GEH recently completed manufacturing of more than 40 Ultra Control Rod Blades for Kernkraftwerk Leibstadt AG to be installed in the Leibstadt Nuclear Power Plant in Switzerland this summer.
 
Control rod blades are long, cruciform shaped metal-tube components that contain neutron-absorbing material and are positioned adjacent to nuclear fuel assemblies within the reactor core.
 
Subscribe to Nuclear Power International magazine



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...