Stake in 24-MW Canadian wind power project sold

wind farm

Boralex Inc. acquired an equity interest in the 24-MW Frampton wind power project in Quebec.
 
Boralex acquired a stake in the plant from Northland Power, bringing Boralex’s total interest to 66.7 percent. The municipality of Frampton owns the remaining 33.3 percent. Frampton will use 12 Enercon E-82 wind turbines and has a 20-year power sales contract with Hydro-Quebec.
 
Construction of the project is scheduled to begin in the first quarter of 2015 in order for it to begin operations in 12 months. The project requires an investment of between C$75 to $80 million ($63.5 to $67.7 million).



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...