Eaton aids in hydroelectric station equipment replacement project

file

Eaton (NYSE: ETN) said it provided services and equipment for an electrical equipment replacement project at a New Hampshire hydroelectric power plant.
 
Eaton provided engineering, procurement and construction services for the replacement of a generator step-up unit transformer, modified and upgraded high voltage bus and structures, upgraded the protection and control configuration and replaced the low-voltage power distribution equipment at the Amoskeag hydroelectric station for Public Service of New Hampshire (PSNH). The project was completed in 2014 and also included power management solutions from Eaton.
 
The Amoskeag Station is a 17.5-MW that includes three generating units located on the Merrimack River in New Hampshire. It is one of nine hydroelectric power plants owned and operated by PSNH.

Subscribe to Power Engineering magazine



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...