Dungeness B nuclear power plant can operate another decade

dungeness

The Dungeness B nuclear power plant was granted a 10-year life extension, plant owner EDF Energy announced.
 
The plant can now operate until 2028 thanks to a £150 million ($227.2 million) investment program to extend the life of the reactor. The life extension is part of an EDF Energy program to extend the lives of its eight nuclear power plants to operate in 2023 when the Hinkley Point C reactor is expected to be completed. The extension came after extensive reviews of the plant’s safety cases and work with the UK’s Office for Nuclear Regulation.
 
Improvement projects at Dungeness include a £75 million ($113.6 million) upgrade to the control room computer systems and £8 million ($12.1 million) in enhanced flood defenses.
 
Subscribe to Nuclear Power International magazine



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...