Nuclear power plant in Belgium to use operator training simulator

file

L-3 Mapps will supply a full scope operator training simulator for the 962 MW Tihange 1 nuclear power plant in Belgium.

The project will begin immediately and is expected to begin service in early 2016. Tractebel Engineering, a unit of Electrabel S.A., will lead the project. The full scope simulator will use L-3’s state-of-the-art graphical simulation PC/Windows-based tools for the plant models and instructor station. All of the plant systems will be simulated in the Orchid simulation environment, including the reactor, nuclear steam supply systems, balance of plant systems, the electrical AC and DC distribution systems, and instrumentation and controls systems.

Tihange 1, a three-loop pressurized water reactor, is operated by Electrabel and is equally owned by Electrabel and Electricite de France (EDF).

Subscribe to Nuclear Power International magazine

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...