Iberdrola continues construction at Texas wind power project

GE wind turbine 2

Iberdrola has announced that construction is continuing at the 202-MW Baffin Wind farm in Kennedy County, Texas following road construction that began in November. The project is expected to reach commercial operation by the end of 2014.

The Baffin Wind Farm will add 101 Gamesa wind turbines and will be the third wind power project in Iberdrola’s Gulf Coast Complex. The three wind farms in the complex will produce a total of 606 MW and become Iberdrola’s largest renewable energy facility in the world.

In addition to the Baffin wind power project, Iberdrola Renewables has more than 500 MW in late-stage development that is on track to begin construction in 2013 or otherwise qualify for the renewable production tax credit.

Read more wind energy news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...