Bechtel completes construction on California solar power project

Bechtel completed construction on Catalina Solar Photovoltaic power plant PV California EDF Renewable Energy San Diego Gas & Electric

Bechtel completed construction on the 110 MW Catalina Solar Photovoltaic (PV) Generating Facility in California.

The plant includes a 7.2-mile transmission line that connects the facility to a substation. The plant is owned by EDF Renewable Energy, which will also provide operations and maintenance services on the project.

San Diego Gas & Electric will buy the output under a 25-year power purchase agreement.

Read more solar energy news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...