Westinghouse wins replacement nuclear fuel delivery contract

Westinghouse announced March 13 it has been selected by Sweden’s Vattenfall Nuclear Fuels AB to provide replacement fuel deliveries for the Forsmark 1 and Ringhals 3 nuclear power plants in 2015 with an option for additional deliveries in 2016.

Westinghouse, which has been one of the main suppliers of fuel to the nuclear plants since 1973, will produce the fuel at its fabrication facility in Vasteras, Sweden. The Ringhals 3 reactor, a 1063 MW pressurized water reactor, was manufactured by Westinghouse, while the 995 MW boiling water reactor Forsmark 1 was designed by ASEA-ATOM, which was acquired by Westinhouse in 2000.

Subscribe to Nuclear Power International magazine

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...