Abengoa & BrightSource to develop solar power towers

Abengoa BrightSource Energy solar tower California Palen

Abengoa and BrightSource Energy signed an agreement to jointly develop, build and operate two solar power towers in California.

Both companies will work together to permit and finance the 500 MW Palen Solar Electric Generating System. Abengoa will be the engineering, procurement and construction (EPC) contractor for the project, and will lead the operation and maintenance of the plants once online. BrightSource will provide the solar field technology and plant design. The plant has received approval from the California Energy Commission for construction and operation.

Each 250 MW unit will use a 750-foot tall tower that allows for a high concentration of heliostats.

Construction on the plant is expected to begin at the end of 2013 and come online in 2016.

Read more contracts and projects news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...