ABB upgrades control system for natural gas-fired turbines

ABB (NYSE: ABB) has commissioned a Symphony control system upgrade for the Pratt & Whitney FT8 TWINPAC natural gas-fired turbines at Iberdrola’s 500 MW Klamath Cogeneration Facility in Oregon.

ABB designed an implemented enhanced control logic and graphics, developed the advanced surge protection module, start-up and commissioning as part of the scope of the project.

Read more instrumentation and controls news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...