Principal Solar acquires 3.5 MW project

Principal Solar, Inc (PSI; OTC Pink: PSWW), has announced the acquisition of a 3.5 MW solar project slated for Andover, Mass. from SunGen and R&D Solar.  Originally developed by Talmage Solar Engineering, Inc. in Arundel, Maine, construction is expected to begin in Q2 2013.  The completed solar system will interconnect to National Grid’s substation in Andover, Mass.

The Andover project expands the presence of PSI in New England.  In 2011, PSI worked with Talmage Solar Engineering, Inc. to acquire two other solar installations: one in Massachusetts and one in Maine. 

Read more solar energy news.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...