Cogeneration power project in Mexico to use Foster Wheeler equipment

Foster Wheeler AG (Nasdaq: FWLT) said that a subsidiary of its Global Power Group was awarded a contract to design and supply two heat recovery steam generators (HRSGs) for the Tereftalatos Mexicanos S.A. de C.V. Top 1002 Cogeneration Project in Veracruz, Mexico. The plant is owned by Cogeneración de Energía Limpia de Cosoleacaque, S.A. de C.V.

Foster Wheeler will design, supply and provide advisory services for erection and start-up of the HRSGs, which will be coupled to two LM 6000PF combustion turbines. Foster Wheeler has received full notice to proceed on the contract, and delivery of the equipment is scheduled for mid-2013.

Read more cogeneration-CHP news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...